OUR WORK · PROJECT

Canceled EV Infrastructure Rollout

CANCELED EV ROLLOUT · NEW INFRASTRUCTURE
$70M
ORIGINAL VALUE
PROJECT OVERVIEW

Creating a path forward for infrastructure stranded by a canceled rollout.

Following the cancellation of a large-scale EV infrastructure rollout, Carmet Scientific acquired more than 40 truckloads of brand-new EV charging infrastructure.

The inventory represented approximately $70 million in original value and consisted of new infrastructure originally intended for deployment as part of the canceled project.

DISPOSITION CONTEXT

A substantial block of new infrastructure needed a new disposition path.

PROJECT STATUS
Large-Scale Rollout Canceled
INVENTORY SCALE
40+ Truckloads
CONDITION
Brand-New Infrastructure
ORIGINAL VALUE
$70M
INVENTORY
40+ Truckloads
ASSET CLASS
EV Charging Infrastructure
THE OUTCOME

A new disposition path for more than 40 truckloads of unused infrastructure.

Carmet acquired the brand-new inventory following the project cancellation, creating a practical disposition path for a substantial block of EV charging infrastructure that was no longer moving forward with its original rollout.

CANCELED OR OVER-PURCHASED PROJECT?

Turn stranded project inventory into a workable exit.

Carmet Scientific works with owners of surplus, canceled and difficult-to-place industrial inventory to identify practical recovery and disposition options.

Discuss an opportunity →