CANCELED EV ROLLOUT · NEW INFRASTRUCTURE
$70M
ORIGINAL VALUE
PROJECT OVERVIEW
Creating a path forward for infrastructure stranded by a canceled rollout.
Following the cancellation of a large-scale EV infrastructure rollout, Carmet Scientific acquired more than 40 truckloads of brand-new EV charging infrastructure.
The inventory represented approximately $70 million in original value and consisted of new infrastructure originally intended for deployment as part of the canceled project.
DISPOSITION CONTEXT
A substantial block of new infrastructure needed a new disposition path.
PROJECT STATUS
Large-Scale Rollout Canceled
INVENTORY SCALE
40+ Truckloads
CONDITION
Brand-New Infrastructure
ORIGINAL VALUE
$70M
INVENTORY
40+ Truckloads
ASSET CLASS
EV Charging Infrastructure
THE OUTCOME
A new disposition path for more than 40 truckloads of unused infrastructure.
Carmet acquired the brand-new inventory following the project cancellation, creating a practical disposition path for a substantial block of EV charging infrastructure that was no longer moving forward with its original rollout.
CANCELED OR OVER-PURCHASED PROJECT?
Turn stranded project inventory into a workable exit.
Carmet Scientific works with owners of surplus, canceled and difficult-to-place industrial inventory to identify practical recovery and disposition options.